Innovative PEB Structures
Engineered for Strength & Built for Excellence
Complete Pre-Engineered Building Solutions
Innovative PEB Structures
Engineered for Strength & Built for Excellence
Complete Pre-Engineered Building Solutions
Innovative PEB Structures
Engineered for Strength & Built for Excellence
Complete Pre-Engineered Building Solutions

Mezzanine in Building

Intermediate mezzanine floors are possible in metal building, mezzanine can be provided in complete or partial area in PEB to suit loading requirement for office or storage. Mezzanine floors consist of Chequered Plate or Galvanized Decking Sheet, supported by joists connected to main mezzanine beams. Main beams normally run across the width of building and are located under main rafters while joists run parallel to length of building. Top flange of joists fit immediately below the top flange of mezzanine beam. A reinforced concrete slab (not supplied by Invogue) is casted on top of Galvanized decking sheet.